Share article


Hello,

We notice you're trying to make a purchase from outside of New Zealand.
If you would like to place an order, please email full details to info@nzia.co.nz


Thank you,

New Zealand Institute of Architects

Title

Content

Back

Back

Back

Back

Back

Back

Selected Project

Napier Saltwater Pools

Completed in January 2003, this new community facility is located on the Marine Parade foreshore, and replaces the post-war outdoor pools which had fallen into disrepair. Conceived as an aquatic experience unique in NZ, the complex provides a mix of aquatic, leisure and fitness facilities, and includes a variety of heated pools to provide for various functions and age groups. The 2-level main building provides 'indoor streets’ crossing at Reception, allowing good surveillance to entrances from Marine Pde, the adjacent Conference Centre, and the existing beach carpark. Ground floor facilities include a Gymnasium; Consultant rooms; Staff facilities; 3 Private Spas; Sauna and Steam rooms; Change and Reception spaces. The upper level contains a large mezzanine to the gymnasium with magnificent sea views, which also connects to a large Terrace overlooking the outdoor pools. The second and third buildings, a self-contained Café Building and the Pool Plant Building, are located on the Marine Parade frontage. A partially glazed windbreak allowing sea views through the site from the historic Swann Memorial on Marine Parade forms part of the secure perimeter.

 
Category
Community & Cutural
Location
Share.