2016 Wellington Architecture Awards Winner
Public Trust
Due to the extent of the strengthening required on this Category 1 historic building, which was completed in 1908, some structural elements are necessarily visible, including major, coupled shear- walls at each end of the long, slim building. The design, however, very successfully preserves the character of the building and creates a very attractive offering of mixed-use tenancies. The key to success here was the ability of the client, architect and engineer to collaborate - the resulting strengthening works have been integrated into the building with great guile.
- Practice
- Warren and Mahoney Architects New Zealand Ltd
- Category
- Heritage
- Location
- Wellington